Here you can see the evaluation of the production result in tabular form:
Explanation of the fields:
| Name | Description |
|---|
| Column A: Planned products |
|---|
| A.1) Target Input Quantity | Planned quantity. Amount of material required for the planned order size. |
|---|
| A.2) Actual Input Quantity | Total amount consumed. |
|---|
| A.3) Difference to actual input | Difference A.2) - A.1) |
|---|
| A.4) Deviation to actual input % | Deviation between A.1) and A.2) in percent. |
|---|
| Column B: Total products |
|---|
| B.1) Target Input Quantity | Input quantity which is required according to the standard BOM for the resulting product (good quantity + scrap). |
|---|
| B.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|
| B.3) Difference to actual input | Difference A.2) - B.1) |
|---|
| B.4) Deviation to actual input % | Deviation between B.1) and B.2) in percent. |
|---|
| Column C: Good Products |
|---|
| C.1) Target Input Quantity | Input quantity which, according to the standard BOM, is required for the resulting usable product (good quantity). |
|---|
| C.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|
| C.3) Difference to actual input | Difference A.2) - C.1) |
|---|
| C.4) Deviation to actual input % | Deviation between C.1) and C.2) in percent. |
|---|
| Column D: Scrapped Products |
|---|
| D.1) Target Input Quantity | Input quantity which is required according to the standard BOM for the resulting scrap. |
|---|
| D.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|
| | |
|---|
Column E: Total Final Products |
|---|
| E.1) Target Input Quantity | Input quantity which is required according to the standard BOM for the resulting end product (good quantity + scrap). The end product is the last production stage within a production order. |
|---|
| E.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|
| E.3) Difference to actual input | Difference A.2) - E.1) |
|---|
| E.4) Deviation to actual input % | Deviation between E.1) and E.2) in percent. |
|---|
| Column F: Good final Products |
|---|
| F.1) Target Input Quantity | Input quantity which, according to the standard BOM, is required for the resulting and usable end product (good quantity). The end product is the last production stage within a production order. |
|---|
| F.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|
| F.3) Difference to actual input | Difference A.2) - F.1) |
|---|
| F.4) Deviation to actual input % | Deviation between F.1) and F.2) in percent. |
|---|
| Column G: Scrapped Final Products |
|---|
| G.1) Target Input Quantity | Input quantity that is required according to the standard BOM for the resulting scrapped end product. The end product is the last production stage within a production order. |
|---|
| G.2) Actual Input Quantity | Total quantity consumed (Same field as A.2) |
|---|